Identify what you thought was the one most important concept(s), method(s), and/or specific item that you felt was worthy of your understanding from the Key

1) Identify what you thought was the one most important concept(s), method(s), and/or specific item that you felt was worthy of your understanding from the Key Terms on page 340 (DO NOT select any of the following terms for this assignment: Project scheduling, Scope or Work Breakdown Structure).

2) Discuss in detail what the selected term means, how it is used and other pertinent information about the selected term including a specific example, application or case study from your own experience. Be specific; not vague or general.

3) Provide a detailed discussion of why you thought this selection is important and how it relates overall to scheduling projects

Your post should be at least 500+ words and in APA format (including Times New Roman with font size 12 and double spaced). Post the actual body of your paper in the discussion thread then attach a Word version of the paper for APA review. Do not use lists or bullet points. This will result in substantial loss of points in the Substance section and the Requirements section.

Books and Resources
Required Text(s):
Pinto, J.K. (2019). Project Management: Achieving Competitive Advantage (5th ed). Boston: Pearson.

Suggested Text (s):
(2017). A guide to the project management body of knowledge (PMBOK® Guide).6th ed. Newtown Square, Pa.: Project Management Institute, Inc.

Needs help with similar assignment?

We are available 24x7 to deliver the best services and assignment ready within 3-4 hours? Order a custom-written, plagiarism-free paper

Get Answer Over WhatsApp Order Paper Now